Skip to content
Dubai ApprovalExperts

Dubai Municipality Approval in Dubai

Dubai Municipality is the main building authority for mainland Dubai. Permits are submitted through the Dubai Building Permit System (BPS) by a registered consultant, with NOCs from DEWA, Civil Defence, RTA and the master developer where needed.

How we help

We prepare the drawings, collect the NOCs, submit to DM, answer the comments and stay on the file until your permit and completion certificate are issued.

  • New villa and building permits
  • Villa extension, renovation and additional floor
  • Mezzanine and structural modification approval
  • Fit-out and partition permits
  • Swimming pool, pergola and boundary wall
  • Permit renewal, amendment and change of contractor
  • Building completion certificate (BCC)

Applicable authorities

The exact route depends on your plot or building. We confirm it before you pay anything.

Documents usually required

Send what you have. We tell you exactly what is missing.

  • Title deed, Oqood or tenancy contract (Ejari)
  • Affection plan or site plan
  • Owner's passport and Emirates ID copy
  • Existing approved drawings, if you have them
  • Photos of the current site
  • Developer NOC, if the plot is in a master community (we can obtain it)

Approval process

  1. 1

    Message us on WhatsApp

    Send the location, a few photos and what you want to build or change.

  2. 2

    Free route check

    We confirm the authority, NOCs and documents needed, and send a clear quotation.

  3. 3

    Drawings and NOCs

    Our engineers prepare the drawings and we obtain the developer or landlord NOC.

  4. 4

    Submission and follow-up

    We submit to the authority, answer comments and keep you updated.

  5. 5

    Permit to completion

    Permit issued, inspections arranged and completion certificate obtained.

Frequently asked questions

Do I need Dubai Municipality approval for my project?

If your plot is on the Dubai mainland and outside a free zone or special development area, building, extension, structural and most fit-out work needs DM approval. Send us your affection plan or title deed and we will confirm the authority for free.

How long does a Dubai Municipality approval take?

It depends on the scope and how complete the submission is. Minor works and fit-outs move faster than new buildings or structural changes. After reviewing your project we give you a realistic timeline, not a guess.

Can I apply to Dubai Municipality myself?

Most building permits must be submitted by a DM-registered engineering consultant. We prepare the drawings and work with registered consultants so the file is submitted correctly the first time.

What does DM approval cost?

There are authority fees set by Dubai Municipality and our professional fees for drawings and coordination. We send a clear quotation after a free review of your project.

Related approvals

Not sure which approval you need?

Send your location and a few photos on WhatsApp. We will tell you the authority, NOCs and documents, free of charge.

WhatsApp CallFree quote